Time-locked project records for disputes, audits, and investigations that surface long after work is done. Capture intentional, append-only records so teams can reconstruct a clean timeline without relying on scattered emails.
Designed for reconstruction, not collaboration.
No calls. No demos required. Self-serve only.
Everyone agrees documentation matters. Most teams still document in a way that fails later.
"Emails are scattered across 15 threads"
→ Hard to prove what was sent when
"Photos exist but lost context"
→ Can't tie them to a specific day
"Logs were updated after the fact"
→ Easily challenged in disputes
Workflow platforms are built for speed, coordination, and ongoing edits. That makes them powerful during a project — and fragile months or years later.
When disputes, audits, or investigations arise, the question is rarely:
"What does the file look like now?"
It's:
"What was known at that time?"
Editable systems preserve the latest state. They rarely preserve intent, context, or decision paths.
Formal record preservation built for timeline reconstruction.
Formal records only — no chat, no casual messages. Every entry is deliberate.
Edits require a new entry with a new timestamp. The past stays intact.
Daily Logs · Inspection Notes · Field Observations · Photo Evidence · RFI References
Capture what was seen, questioned, or clarified — before memory fades.
Chronological exports with timestamps and hashes for reconstruction.
Each record includes SHA-256 hash and UTC timestamp for verification.
Clarity on what BuildStamp does — and doesn't do — protects everyone.
🔒 Important: BuildStamp is a preservation utility, not a vault. Export functionality is provided so teams can maintain independent backups. Teams are responsible for exporting records for long-term retention requirements.
Professionals who expect their records to be reviewed later.
Daily logs that won't be challenged
Timeline evidence for disputes
Inspection notes that hold up
Reconstruction without discovery chaos
BuildStamp is designed for professionals involved in disputes, audits, and investigations — not for daily workflow or field operations.
Export required before access expires.
Create Dispute Evidence PackageRetention while subscription is active.
Preserve Project TimelinesRetention periods represent maximum intended availability while the service is active.
Users are responsible for exporting and maintaining independent copies for long-term needs.
The math: One disputed change order can cost $50K+ in legal fees. BuildStamp costs less than two billable hours.
Informed by real-world experience from construction managers, civil engineers, and investigation teams involved in claims and disputes.
Self-serve access. No calls, no demos, no pressure.
View Pricing Options